Screen Shot 2020-02-03 at 2.18.16 PM

The first major section of the Lower Macungie Township Greenway to be constructed after adoption of the 2012 master plan is located between Brookside and Wild Cherry Rd.

Leave a Reply

Your email address will not be published. Required fields are marked *